Gage Brothers logo

(605) 336-1180

2810 N Bahnson Ave | Sioux Falls, SD

  • Home
  • Products & Services
    • Architectural Precast
    • Structural Precast
    • Precast Sustainability
    • Samples
    • Gage Brothers Restroom Structures
    • Gage Brothers Caulking
    • Design Assistance
  • Project Gallery
  • Who We Are
    • Our History
    • Our Staff
    • Our Professional Associations
    • Our Community Involvement
    • Our Company Updates
  • Careers
  • Contact
< Return to Project Gallery

Target Field

Architect: Populous

Contractor: Mortenson Construction

Location: Minneapolis, Minnesota

Year: 2010

Project Description:

Home of the Minnesota Twins

The stadium is a modern architectural expression; a dichotomy of cosmopolitan lifestyle rooted in nature and the outdoors. The stone and glass landmark, topped by a metal-clad, sculpted roof canopy, is chiseled into a downtown urban setting on one of Major League Baseball’s smallest sites. The urban appeal of the ballpark is enhanced with the addition of new, immediate access to light rail and commuter rail, bridging the site to its urban surroundings and spurring development in a once-forgotten corner of downtown.

Precast concrete is an essential component of the landmark facility; the architecture of the facades include large, stacked blocks of limestone that are native to the region. The honed and quarry creek rocked faced stone varies in thickness and is cast into the precast concrete wall system. There was nothing square, straight or plumb about the exterior precast concrete wall system. Many walls were battered a variety of different degrees, while each corner seems to intersect at a different angle. All these different interfaces provided for challenging geometry.
Given the tight, postage stamp size jobsite, with rail and overpass bridges bordering, it was essential to utilize a manufactured architectural precast concrete wall system, which could be set from the bowl since there was no perimeter access. The precast concrete building system allowed for a reduction in schedule risk, minimized site laydown area, dust and noise.

Project Details:

  • Project cost: $545,000,000
  • 39,504 spectators
  • LEED® Silver Certification
  • 1,779 pieces of concrete
  • Battered walls with large cast-in limestone blocks (3’-9” to 5’-0”)
  • In 2010, ESPN voted the venue as the best sports experience in all professional sports in the United States.
Previous Next

Contact Us


(605) 336-1180

Visit Us


2810 N Bahnson Ave
Sioux Falls, SD 57104

Follow Us


Mortarr Icon

© Gage Brothers. All rights reserved. Website Designs & Developed by The Gage Team.

Project Gallery


01
02
03
04
05
06

Church & Worship
Collegiate
Commercial & Retail
Healthcare
Hotel
Justice & Correctional

07
08
09
10
11

K-12
Office Building
Public & Government
Stadium & Arena
Water & Wastewater