Gage Brothers logo

(605) 336-1180

2810 N Bahnson Ave | Sioux Falls, SD

  • Home
  • Products & Services
    • Architectural Precast
    • Structural Precast
    • Precast Sustainability
    • Samples
    • Gage Brothers Restroom Structures
    • Gage Brothers Caulking
    • Design Assistance
  • Project Gallery
  • Who We Are
    • Our History
    • Our Staff
    • Our Professional Associations
    • Our Community Involvement
    • Our Company Updates
  • Careers
  • Contact
< Return to Project Gallery

Sanford Heart Hospital

Architect: AECOM

Contractor: Henry Carlson Construction

Location: Sioux Falls, South Dakota

Year: 2012

Project Description:

The 205,000 square-foot hospital consolidates cardiac programs under one roof, housing physician offices, outpatient testing, surgical services, cath labs, and consultation services. It also includes 58 inpatient beds, cardiovascular operating rooms, a hybrid operating room, and clinic and outpatient services.

The hospital's design reflects the institution's signature Collegiate Gothic style. Originally, the project was a conventional full brick job with steel stud back-up. It was a very tight site on a large host campus so site disturbance and layout room for a masonry crew presented challenges. The precaster was able to solve the site problem, substantially cut on-site work, and saved the project over $500,000. In addition to the budgetary savings, precast also provided for much better humidity management for the hospital setting.

Utilizing precast panels saved three to four months from the project's schedule in lieu of using conventional brick veneer. Precast also reduced the project's cost by not requiring the heat and shelter necessary in order to install traditional brick in the cold winter months. Precast provided a solution that saved a month of the schedule on the clock tower structure alone. By utilizing precast, the project was able to save tons of steel that would have been required with a conventional brick and stud system. The project also saved thousands of joints since the heads, sills and trim work were integrally cast in lieu of separately layered up pieces.

Project Details:

  • Project Start Date: September 2009
  • Project Completion Date: February 2012
  • Project cost: $75 million
  • 936 pieces of concrete
  • 89,311 square feet of concrete

 

Previous Next

Contact Us


(605) 336-1180

Visit Us


2810 N Bahnson Ave
Sioux Falls, SD 57104

Follow Us


Mortarr Icon

© Gage Brothers. All rights reserved. Website Designs & Developed by The Gage Team.

Project Gallery


01
02
03
04
05
06

Church & Worship
Collegiate
Commercial & Retail
Healthcare
Hotel
Justice & Correctional

07
08
09
10
11

K-12
Office Building
Public & Government
Stadium & Arena
Water & Wastewater